Category Archives: Railways

Sir Vincent Litchfield Raven: railway legend

Even among railway enthusiasts, Sir Vincent Litchfield Raven is one of the less well known names, yet he was hugely influential in shaping the railway system as we know it today. Rising from an apprentice to Chief Mechanical Engineer, he only ever worked for the North Eastern Railway and for a short while, early in his professional career and newly married, he lived on Heaton Road.

RavenIm1925IMERavenres

Vincent Litchfield Raven

Early Life

Vincent Litchfield Raven was born on 3 December 1858 in the village of Great Fransham, North Norfolk, the third of 10 children born to Vincent and Anne Raven. His father was the Rector of All Saints church in the village and the family were clearly wealthy middle class, as Vincent and five of his six brothers went to Aldenham Grammar School in Hertfordshire, a small private school, where he would have received a conservative Anglican flavoured education. The 1871 census shows him boarding there as a scholar, aged 12.

He moved straight from school to an engineering apprenticeship with the North Eastern Railway. Such a move may seem odd to our minds, but at the time, with the rapid Victorian growth of industry and commerce, careers in science and engineering were increasingly regarded as acceptable to the middle classes. Clearly, young Vincent’s family supported his move to the North Eastern Railway, as a five year apprenticeship, would typically cost the family around £50 per year, over £4,000 in today’s money.

North Eastern Railway

The NER was established in 1854 from the merger of a number of smaller companies. The early years of the railways had seen numerous companies established, often operating often relatively small routes or branches, each with their own locomotives and rolling stock. The North Eastern Railway was unusual in that it recognised early the benefits of larger scale operations and over the 50 years from its establishment bought numerous smaller companies, so that by the early 1900s, it had a virtual monopoly east of the Pennines from south of Doncaster right up to the Scottish border at Berwick. By the time Raven joined the company, there were around 1,500 miles of track. The NER also owned docks at Hartlepool, Hull, Middlesbrough and Tyne Dock as well as staithes at Blyth and Dunston (still the largest wooden structure in Europe) and hotels in York and Newcastle.

Apprenticeship

In making the long move north, the young Vincent undoubtedly found an employer that was at the leading edge of railway development. Unusually, for someone who was, 35 years later, to take on the post of Chief Mechanical Engineer, he only ever worked for the NER, although it’s obvious that he put considerable effort into furthering his knowledge and education throughout his career, including a number of foreign visits. He retired when legislation forced the merger of railway companies into the big four (LNER, LMS, GWR and Southern) in 1923.

Vincent left school at Easter 1875, taking up his apprenticeship at the North Eastern Railway’s Greenesfield works on the south bank of the Tyne, between the High Level and the modern day Redheugh bridges.

He was apprenticed directly to Edward Fletcher, the Locomotive Supervisor (the most senior engineering position at that time) to whom the apprenticeship fees would have been paid directly.

RavenGreenesfield worksres

NER’s Greenesfield works

As the picture shows, the Greenesfield works were vast and incorporated the original Gateshead station, the northern terminus of the line from London before the building of the High Level Bridge, as well as five turntables and 18 roads of track, as well as massive cranes that could lift a whole locomotive. As an apprentice, Vincent would have gained experience of every aspect of railway engineering, from cleaning, firing, driving and maintaining locomotives, through to making technical drawings of engines, carriages and wagons. He would also have been required to work with the railway’s engineers, labourers and managers at all levels of the organisation, giving him a sound grounding in engineering, before starting work as a junior engineer in 1880.

Throughout his apprenticeship, Vincent seems to have lodged with the Swallow family, George and Isabella and their young daughter Maria in Elswick, which is where the 1881 census shows him living.

The Heaton connection

Having completed his apprenticeship in 1880, Vincent’s first job was as fireman, where he appears to have been based at the Heaton depot. Opened in 1875 to provide extra capacity for the overstretched Greenesfield works, the Heaton Depot was the home base for locomotives and carriages, where they would be stored maintained, serviced and repaired – a role that it still plays today with the modern fleet.

It appears that Vincent was based here in his early working career as it was 30 Heaton Road that Vincent made his first family home on his marriage to Gifford Allan Chrichton on 15 February 1883. Gifford was born on 13 August 1859 and was the eldest daughter of John Taylor Chrichton and his wife Emma of 13 Catherine Terrace, Gateshead. Her father is described as a chemical agent, and Raven’s biographer describes him as working for the Walker Alkali Company. Although the company had closed by the time of the Raven’s marriage, the Walker Ironworks shared the same address and both seem to have been overseen by Isaac Lowthian Bell, a wealthy Ironmaster and Director of the NER. That would no doubt have been a very valuable connection for the young Vincent to make as his career progressed.

The 1884-5 electoral roll for Newcastle shows the family at 30 Heaton Road, a quite substantial terraced house, then relatively newly built. It was there that the couple’s first child Constance Gifford Raven was born later in 1883.  The couple would go on to have a further four children over the next six years, one of whom, Annie, died in infancy.

Raven30 Heaton Res

30 Heaton Road

Their stay in Heaton though was short-lived, as in 1884, the family moved to Gateshead with Vincent’s first promotion to workshop foreman back at Greenesfield.

Career progression

Vincent’s career progressed rapidly through a number of promotions as he continued his study through the North Eastern Railway’s own Literary Institute, where he quickly became a committee member of the Gateshead branch, as well as attending lectures at the newly established Rutherford College in Arthur’s Hill. It seems likely that this is where he developed his interest in the electrification of railways, which was to become a feature of his career as well as the source of much frustration.

By 1891, Vincent was Assistant Locomotive Superintendent at Greenesfield and the family were employing two resident domestic servants.

RavenBluePlaque

Commemorative plaque near the High Level Bridge, close to the site of the Greenesfield works.

His next promotion was to the post of Chief Assistant Locomotive Superintendant, which saw the family move to Darlington, where the NER’s main locomotive works was sited. The 1901 census shows them employing three resident staff, ‘a hospital sick nurse’, cook and domestic. The nurse was most likely employed for the Raven’s second daughter Guendolin (born 1884), who had suffered from glandular fever and was left with subsequent heart problems. The family stayed in Darlington for the next 30 years, taking on an increasing role in the civic life of the town, even hosting balls in their home.

Vincent’s next promotion was to the post of Assistant Chief Mechanical Engineer in 1902, eventually taking over from his boss, Wilson Worsdell, when he retired in 1910.

Chief Mechanical Engineer

On 1 June 1910, Raven took up his new position, responsible for the design, construction, repair and operation of rolling stock and all outside machinery for the railway. At that time, the railway had 2,000 locomotives, 4,600 coaches and 11,200 wagons as well as the various docks, staithes etc. His salary was £2,500 (about £276,000 in today’s money). In addition, he had his own locomotive and six wheeled carriage, available to take him wherever he wished on the network as well as his own chauffeur driven car. This was a post of the highest status within both the railway and society. He was based, from 1911 in the newly built Palladian style Stoopergate building.

RPMI, Stooperdale Offices, Darlington, Previously the London & N

NER’s Stoopergate, Darlington

Part of a wider new development that included boiler shops and a paint-shop that could accommodate 24 locomotives, the new offices had every modern convenience and were described as draught proof, floored with Terrazzo marble Venetian mosaic and oak panelled. The complex included sidings for the delivery of coal and a garage for his car and were equipped with telephones.

The family business

Railway engineering was obviously in the family blood. Both of Raven’s sons went on to work on the railways. Norman Vincent Chrichton Raven, the eldest, was apprenticed to the Great Northern Railway, which was responsible for the section of the east coast mainline between London and Doncaster and would have worked under Nigel Gresley, who became the first Chief Mechanical Engineer of the LNER after grouping in 1923. Ultimately, he moved on to the steel industry.

Frederick Gifford Raven, the youngest of the four surviving Raven children, did his apprenticeship in the UK before working on the railways in Brazil and India before the start of the First World War. With the onset of war, he joined the Royal Engineers Railway Operating Division as 2nd Lieutenant, where he would have been responsible for the railways that moved troops and equipment to and from the front. Badly injured by shell fire on the Somme, he was evacuated to a military hospital in Le Havre, where he sadly died of infection on 24 March 1917.

Even Guen, the second eldest daughter married into railway royalty. She married Edward Thompson, a protégé of her father in 1913. Thompson would go on to become the LNER’s second Chief Mechanical Engineer. Only Connie, the Raven’s eldest daughter moved out of the business, marrying solicitor George Newby Watson in 1910.

Sir Vincent Raven

The First World War saw Raven’s skills as an engineer and leader put to different uses. On 15 September 1915 he was appointed Chief Superintendent to the Royal Ordnance Works at Woolwich, released from his position at the NER for the duration of the war. Sir Frederick Donaldson, the holder of the position had gone to the US and Canada to work increasing their production of weapons and Raven took over. He very quickly had a positive impact on production, which was falling dangerously behind the army’s needs. Lloyd George, Minister of Munitions, reported to the House of commons in December 1915 that he had increased production by 60-80% while staff had only increased by 23%. When Lloyd George became Prime Minister of the wartime coalition government, he rewarded Raven for his efforts with a Knighthood in the 1916 New Year honours.

Civic life

Aside from his professional life, Vincent Raven always played a significant wider role and maintained a particular interest in education. Right from his early days he’d been involved on the committee of the NER Gateshead Literary Institute and remained their honorary president throughout his career. He also became involved in the education committee of Darlington Technical College and was active in both the Institute of Civil Engineers and the Institute of Mechanical Engineers, who elected him Honorary Life Member in 1932. In 1915 Raven was elected Councillor in Darlington and quickly co-opted onto the tramways committee and in 1917 he became a Justice of the Peace.

Raven the innovator

What is apparent from his long and successful career is Vincent’s detailed and methodical approach to improving efficiency, problem solving and, in particular, his passion for electrification of the railways. One of his early tasks as assistant CME was to do a detailed analysis of the steam engine fleet, which he did in meticulous detail, identifying numerous improvements. It was this attention to detail that led to his success in the Royal Ordnance Works and to improving efficiency across the NER network. As Chief Mechanical Engineer, he focused his attention on compounding and superheating as means of improving the efficiency of steam locos and his own designs were elegant and efficient, but he always had his eye on the longer term goal of electrification.

As Assistant Chief Mechanical Engineer, he would have been involved in the 1904 electrification of the North Tyneside commuter network, only the second electrified network in the UK outside of London. In 1905, he electrified the Quayside branch from Manors Station, which was notoriously difficult for steam engines, with a steep incline, 90 degree curves and a 2 mile, poorly ventilated tunnel. In 1911, he gained approval for his most ambitious venture in electrification, the 15 mile mineral line from Shildon to Newport, Middlesbrough. When the line opened in 1916, the Newcastle Journal listed the many advantages of electrification in an article on 26 May. These included much greater efficiency and control as well as a more comfortable environment for the crew. The electric locos were designed by Raven, with the electrification of the route done by Newcastle firm Merz & McLellan. This was the first industrial railway line to be electrified in the world and continued operating until the 1930s, when it reverted to steam operation!

Of course the big prize was to electrify the east coast main line and Raven had plans to do so as early as 1910, although he may well have been ahead of his time, as he himself recognised as the real problem was the transport of electricity from power stations. Before the widespread adoption of alternating current, the direct current supply could only be transported a short distance without a drop in voltage, meaning lots of small local power stations close to the track would have been required.

The war prevented him from further pursuing his plans and when he returned in 1919, the financial position of the railways after four years of diverting all resources to the war effort was too poor to consider investment on this scale. With the approaching grouping of the railways in 1923, Raven set out a clear and detailed case for electrification of the LNER main line, but it was rejected.

Whether because of this or the prospect of being based at Kings Cross, Raven decided not to stand for the post of Chief Mechanical Engineer for LNER, which was taken by Nigel Gresley and when NER became LNER he retired, having started at the bottom and reaching the top of his chosen profession while only ever having worked for the North Eastern Railway.

The final years

Leaving NER didn’t mean the end of Raven’s work with the railways, but gave him the opportunity to pursue his passion for electrification as well as applying his knowledge as an independent expert. In 1923 he was appointed to the board of Metropolitan Vickers, who made electric trains for the London Underground and South East Network and also joined the Institution of Electrical Engineers. He took part in Royal Commissions to report on the railways in New South Wales and New Zealand and was frequently consulted as an expert, particularly on electrification. In 1925, he became president of the Institution of Mechanical Engineers.

The Ravens moved in 1923 from Darlington, as Grantley, their home in recent years, belonged to LNER. Their new home in Hook, Hampshire was nearer to London, the centre of most of Raven’s work.

While on holiday with Gifford at the Felix Hotel Felixstowe late in 1933, Vincent fell ill, heart problems were suggested and he died there on 14 February 1934.

Probate records show that he left £20,036 14s 6d. His legacy to the railways that were his lifelong passion was incalculable, even if it were to take another 50 years before the east Coast Main Line was finally electrified.

Can you help?

If you know more about Vincent Litchfield Raven, especially his time in Heaton, we’d love to hear from you. Please either leave a reply on this website by clicking on the link immediately below the article title or email chris.jackson@heatonhistorygroup.org

Acknowledgements

Written and researched by Michael Proctor, Heaton History Group.

Sources

Everett A (2006) ‘Visionary Pragmatist, Sir Vincent Raven North Eastern Railway Locomotive Engineer’

Ancestry.co.uk

Wikipedia.org

The type of passenger train William Skinner was driving in 1926

Dead Man’s Handle

It is late evening on a Saturday in early August 1926. The sun set an hour ago, but the sky in the west is still bright. The gaslamps of Heaton railway station dimly illuminate the expanse of the glass canopy above. The two platforms of the station are virtually deserted, and its signal box is closed for the night. The station foreman is in his small wooden office, catching up with the paperwork now that the trains are less frequent. The last of the birds are singing their songs in the trees above the cutting walls before they settle down for the night.

From the east comes a distant whistle, high pitched and short, and then the puffing and wheezing of a steam locomotive. Round the bend from Heaton Yard appears an engine, small and black but kept clean and shiny by its crew, starting up its short train. It is a ‘Special Goods’ for Blaydon made up of 13 wagons from railway companies far and wide. Slowly the engine clanks by, its crew exchanging a wave with the station foreman whose head pokes out from his office door to watch its passing.

A procession of wooden goods wagons goes rumbling and squealing through the platforms, the noise echoing off the walls that surround Heaton station in its cutting. The first wagon has ‘GW’ painted on its side, an indication that it belongs to the mighty Great Western Railway. Then comes one with ‘L&Y’ indicating that until the 1923 ‘Grouping’ of the railway companies it had belonged to the Lancashire and Yorkshire Railway. The next wagon is brand new grain wagon, probably filled with the products of a farm somewhere in Northumberland. It has the letters LNER on the side, a company formed only three years ago, and one which took over the running of Heaton station and its trains from the old North Eastern Railway.

The train clanks its way along the up main line; the driver has no worries about holding up fast express trains at this time of night and has a clear run at least as far as Manors. That’s the next station towards Newcastle to the west, after the cutting in which Heaton station stands opens out for the junction at Riverside, and then the great viaduct over the Ouseburn. The red glow from the tail lamp on the guards van slowly disappears off down the line as the steam, trapped under the huge glass canopy above, slowly starts to drift away through the trees and into the darkening sky.

Ten minutes later a different sound drifts in from the east. This time it’s the swishing and clackety-clack of a much faster train running in on the line from Tynemouth and the coast. It’s one of the old North Eastern Railway’s electric trains, built in 1904 but still performing a sterling service over 20 years later. It’s possible to tell from the roofs that the second two carriages in the train are much newer, built only six years ago to replace the trains lost in the fire at Heaton Car Sheds. Some of the cars are still painted in the old North Eastern Railway crimson lake, but others have already acquired the new drab teak colour favoured by the LNER. The lights from the carriages illuminate the cutting walls as the train speeds into the station, displaying ‘CENTRAL’ on the front.

Experienced driver

At first it appears it’s not going to stop in time, but the driver, William Skinner of Felton Street, Byker, applies the brakes firmly and the train squeals to a halt in the platform. The sliding door of the van section of the first carriage rumbles open and out steps Skinner onto the platform, standing about two feet from his train. The train is made of wood, with matchboard on the lower half, and large windows above. Inside it looks comfortable but functional, and only one young couple can be seen inside the first class compartment of the first vehicle. There is a large parcels compartment in this first coach, one of the motor luggage composite carriages built at the opening of electric services, to carry fish from the coast and the prams of toddlers on their way to the beach.

The type of passenger train William Skinner was driving in 1926

The type of passenger train William Skinner drove through Heaton  in 1926

Skinner is 35 years old and has worked on the railway for 18 years, starting off as a cleaner and being promoted to a driver six years ago. He has been mainly been driving goods trains of late, but passed for driving these electric trains four years ago. This is a nice change for him, running out to the coast on a clean electric service instead of the heat, smoke, and grime of a goods train. He has enjoyed his ride so far, fast out to Monkseaton and then stopping at all stations on the return to Newcastle Central station. After this stop he only has Manors to go before his arrival back at the Central. His wife and five children will be waiting for him at his home, which is only a mile away from where his train currently waits.

Last trip

The station foreman emerges from the gloom and stands on the platform to watch the passengers disembark. They’re mainly day-trippers who’ve enjoyed an evening at the coast, with few people getting on at this time of night. He notices Skinner on the platform, which seems a bit odd to him, and shouts hello. “Is this your last trip?” he asks, to which Skinner replies “Yes!” The train’s guard, George Patterson, closes the metal gates on the old carriages, and the doors on the new ones, and gives a blast on his whistle. Skinner gets back into his van and re-enters his cab, but doesn’t take the time to slide the door closed. The train’s Westinghouse brakes hiss as they’re released and with a whirr and a whine the train accelerates quickly off towards Newcastle, blue flashes of electricity lighting up the station as the current arcs from the conductor rail beside the tracks.

The train now gathers speed, getting up to its full pace as it rattles over the pointwork at Riverside Junction, where the line to the shipyards of Walker and Wallsend peels off to the left. Over the huge iron structure of the Ouseburn viaduct it roars, the lights of the factories and warehouses dimly twinkling in the gloom below. In his van at the rear of the train, Patterson is engaged in making notes for his next trip as the train clickety-clicks its way through the darkness towards Newcastle. Into the cutting it goes, towards Manors station and its complex junction of lines. It rattles past Argyle Street signal box, its signalman hard at work in his little illuminated world, and into the bend at Manors. But as Patterson looks up from his work and out of the window his heart skips a beat; he sees that they’re already pulling into the platforms but still going full speed. He hadn’t noticed, so engaged was he in his work, that Skinner hadn’t tested the brakes at Argyle Street as he should have done. Up he jumps, and makes for the door to the driver’s compartment at the back of the train to apply the Westinghouse brake.

The signalman at Manors, Francis Topping, had it all planned out. The goods train that had passed Heaton fifteen minutes ago had arrived at his signal box ten minutes later. It had stood at his Up Home Main Line signal for a minute or two whilst he let traffic clear the junction but when he was ready for her to move he’d set the signal for the train and with a toot and a hiss it was already underway. His intention was to let it clear the junction whilst, as the rules stated, he brought the passenger train almost to a stop on approach to the platforms before allowing it to pull in. As soon as he’d heard the bell in his box that signalled the entrance of the passenger into his section he’d set the ‘calling-on’ signal to allow it into the station.

But now Topping turns to look out of his window and up the line towards Heaton and his face freezes in terror. He immediately realises that the train is going far too fast to stop at the signal as he’d intended. He watches it race at full speed towards his signal box, which straddles the tracks to the west of the station and affords a grandstand view of the drama playing out below. The passenger train heads inexorably towards the special goods that is now across the junction in front of it and leaving nowhere to go. In the cabin at the back of the train George Patterson is frantically applying the Westinghouse brake to slow the train down, but it’s too late. It ploughs into the third vehicle of the goods train, a loaded grain wagon, with a glancing blow. Splinters of wood and metal fly into the air. The electric train lurches to the left, rips the steps from Topping’s signal cabin, and jams itself against the parapet wall of the railway viaduct, balancing above the street some 60 feet below, bricks and rubble falling down onto the road. The other vehicles are derailed too but stay upright, crashing into the back of the first, and a cloud of dust and smoke fills the air.

Signalman Topping regains his senses, and springs into action. He knows his duty in an emergency like this, and immediately protects all of the lines leading to and from his signalbox and summons ambulances and the police. Thankfully the automatic circuit-breaker for the electrical system has worked as intended and there is no fire amongst the wooden coaches and wagons. He watches as passengers warily make their way out of the carriages, and the driver and fireman of the goods train run back to help them. He looks down on the wreckage below and knows this is going to take some time to sort out. “Just what was that driver doing?” he wonders to himself, almost in disbelief.

Within minutes Inspector Gill from the Northumberland Constabulary is running up the ramp onto the platform at Manors station from the street below with a number of his constables. He clambers down onto the tracks and makes his way towards the half-demolished first carriage of the passenger train. Carefully picking his way through shattered wood planks and broken glass, he reaches what is left of the driver’s cabin. With the help of his men, he begins to clear the wreckage in expectation of finding the driver’s body. He moves aside twisted metal and wood, grains of wheat falling down onto the tracks below from the destroyed wagon which had borne the brunt of the impact. But search as they might, they find no sign of Skinner’s body.

Dead man’s handle

Eventually the inspector reaches the control unit of the electric train. He finds the controller, which limits the power to the train and thus its speed. The handle is in the ‘Full Power’ position, with the reversing key in ‘Forward’. Skinner hadn’t even made any attempt to stop accelerating the train. The controller has an important safety feature, the ‘Dead Man’s Handle’. This is actually a button on the top of the controller which must be pressed down at all times by the driver or the power to the train is automatically cut-out. The dead man’s control on Skinner’s train could never do its job, however, because he’d seen to it himself that it would not work.

Inspector Gill finds the button on the controller cleverly tied down by two handkerchiefs, which together exert enough pressure on the button to ensure it is kept constantly pressed. A red handkerchief is looped around the controller handle and over the control button and knotted in place with a triple-knot. Over this the second hanky, a white one, is tied even tighter around the first adding to the pressure on the button. This is secured with a double knot. The arrangement of the hankies evidently saved Skinner from having to constantly press the dead man’s control, something which became wearisome after a while, and leave the controller with the train still under power.

Inspector Murray arrives at around 12:50am and examines the handkerchiefs. He finds no identifying marks on either, and removes them for safe keeping. For the next two hours a search of the wreckage continues. Thankfully there were only two passengers travelling in the first vehicle of the train, a young couple from Durham, who miraculously only suffered leg injuries and shock. The other 150 or so passengers in the remaining five coaches of the train walked away relatively unscathed. What the constables and inspectors are searching for is Skinner, and he is nowhere to be seen. Some firemen are asked to search the roofs of the houses in the street below in case his body had been catapulted from the train, but to no avail. Eventually Murray calls over Sergeant Sandels and tells him to start walking back up the line towards Heaton to see if he can see any sign of Skinner, or anything untoward.

So Sandels sets off walking, back past the silent and dark carriages of the now-empty 9:47pm Newcastle to Newcastle (via Monkseaton), down the ramp at the end of Manors station platform, and into the cutting towards Argyle Street signal box. The crunch of the ballast is loud beneath his feet as he walks up through the damp cutting, scanning the darkness below with his eyes for the sight of anything strange. He passes the entrance to the Quayside railway, its foreboding tunnel disappearing to his right and down to the river where ships unload their wares into waiting railway wagons. He passes under the short tunnel where New Bridge Street passes overhead, and then under Ingham Place and Stoddart Street. The lights of the signals are all on red as far as he can see along the straight line ahead, their beams glinting off the shiny railtops of the many sidings and running lines. Out across the Ouseburn Viaduct he strides, with the smells of industry and animals drifting up from below, the sky lightening to the east ahead of him. He hears a ship’s hooter echo mournfully from the River Tyne to his right as he presses on past Riverside Junction signal box and the little station at Byker.

Eventually, after walking over a mile, he comes to the bridge carrying Heaton Park Road over the railway. There he sees something on the tracks; a dark shape lying beside the electrified rail on the left-hand side of the lines as he faces east. Sandels runs towards this object and bends down to look more closely; it is Skinner, lying on his back with his feet facing away towards Heaton station, his right arm outstretched below the conductor rail and his eyes staring lifelessly up. Sandels checks for a pulse, not expecting to find one. He doesn’t. Skinner is dead and already quite cold.

Sandels runs to Heaton station and asks them to call for a local doctor. Dr Blench arrives after half an hour, during which Sandels has been standing guard over Skinner, trying to comprehend what has happened that night. The doctor examines the body, and finds that the back of his head is badly injured and his skull fractured. There are also bruises down his neck and back. The two men then get up and walk over to the row of iron columns supporting the road above. On the nearest column to the body they find a patch of blood. Then on the next another patch, higher than the first, and the same on the third column higher still. On the first of the bridge’s columns that Skinner’s train would have reached they find a patch of blood, quite high up, but about the height at which Skinner’s head would have been whilst leaning from the train. Sandels sits down on the rail with a sigh and waits for his inspector to arrive. “The damn fool!” he whispers to himself.

Epilogue

Nobody will ever know what went through Skinner’s mind that night. It was clear that tying down the ‘dead man’s control’ was a common practice for him. But why did he set his train in motion then go to the door of his van to look back along the train? Why did he forget about the bridge, under which he’d passed many times before? That accident at Manors thankfully claimed no further lives, and Skinner was the only victim of his own misfortune. His widow and five children were left to ponder his actions, and given his implication in the accident it is unlikely that the railway company were particularly generous towards them. Whilst there was quite a stir in the area at the time of the accident, it was soon forgotten and the electric trains went back to running their busy service for the next 35 years.

Postscript

Since this article was written, the author and Chris Jackson, Secretary of Heaton History Group, were privileged to meet Olive Renwick, daughter of Francis Topping, the signalman on duty at Manors on the night of the accident. See the article ‘The Signalman and his Daughter’ for more about them both.

Francis Topping (left)had a road in Hartlepool named after him

Francis Topping (left)had a road in Hartlepool named after him

Author

Researched and written by Alistair Ford. Alistair has lived in Heaton for 10 years. He is a researcher into sustainable transport and climate change at Newcastle University with a ‘passing interest in railways’. 

 Sources

Newspaper report of the incident: https://news.google.com/newspapers?nid=2507&dat=19260809&id=Y51AAAAAIBAJ&sjid=SKUMAAAAIBAJ&pg=2327,4806101&hl=en

Newspaper report of the inquiry: https://news.google.com/newspapers?nid=2507&dat=19260819&id=bJ1AAAAAIBAJ&sjid=SKUMAAAAIBAJ&pg=6455,6064739&hl=en

Accident report: http://www.railwaysarchive.co.uk/documents/MoT_ManorsJunction1926.pdf

Can you help?

If you have further information about this incident or any of the people mentioned or have  knowledge, memories or photographs of railways in Heaton more generally that you’d like to share, please either leave a comment on this website by clicking on the link immediately below this article title or email Chris Jackson, Secretary, Heaton History Group (chris.jackson@heatonhistorygroup.org).

The original Heaton Station

Heaton Station: a whistle-stop tour

Heaton’s place in history is bound up with railways so we thought we’d chug along its stations’ timeline to see what we could find. The original Heaton Station was on the first railway to pass this way – the line from Newcastle to North Shields and later Tynemouth, which opened on 18 June 1839. The station was situated just to the North East of what later became called Heaton Road. The precise construction date is a little uncertain but there are press adverts which mention trains stopping at a station at ‘Heaton Hall Lane’ as early as 1841.

Mention of Heaton Hall Lane Station, May 1841

Advert in ‘Newcastle Journal’, dated 15 May 1841

The first mention we have so far found in news reports dates from 1844 when a passenger walking home from the station after dark fell from the bank by the lead factory into the Ouseburn. By the mid 1840s, there were already plans for a new line to Berwick, which meant that Heaton was destined to become an important junction. The stretch from Heaton to Berwick opened on 29 March 1847. This illustation dates from that time. Thank you to Alan Morgan in whose book ‘Heaton: from farms to foundries’ it appears.

Drawing of the original Heaton Station, 1847

Drawing of the original Heaton Station, 1847

Royal visit

Here is a selection of news stories featuring Heaton Station in its early years.

On Friday 28 September 1849,  Queen Victoria travelled down the new east coast line on her return from holiday in Balmoral. A public holiday was declared in Newcastle and although the weather was inclement,  the crowds were undeterred:

‘Heaton Station was the point at which her majesty entered the borough of Newcastle, and here was a profuse display of flags and ornamental devices in flowers and evergreens.’

‘Commencing at Heaton Station a long and dense crowd lined the railway to the Ouseburn Bridge and even the hills some distance from the line were covered with spectators.

While she was here, she opened the new High Level Bridge. This picture of the royal train that day is from the Illustrated London News.

Queen Victoria's train in Newcastle

In August the following year, there was another local public holiday when the queen and her family again passed through Heaton, this time after after stopping in Newcastle to open the new Central Station on their journey North.

New station

In 1861 advertisements inviting tenders to build a new station and station master’s house at Heaton appeared in the press. This would explain why the next photograph, dated 1886, looks quite different from the much earlier drawing.

Advert for tendeer for new station and station-master's house

Newcastle Journal, 6 May 1861

The original Heaton Station

Heaton Station, 1886

This photograph is published by kind permission of Beamish Museum and John Moreels of Photo Memories.

Then on 6 November 1886, when the track was also widened, The Newcastle Courant announced that work had begun on a completely new station which

‘is situated to the west of the present one. … bridge building will be necessary as the platform will be intersected by lines of rails. These works are giving work to a large number of men, and as a large amount of house-building is going on in the locality, that part of the town presents quite a brisk appearance.’

On 1 April 1887, the old station closed and on the same day the new one opened on on North View on the opposite side of Heaton Road. Again the photograph below is published with the permission of Beamish Museum and John Moreels of Photo Memories.

'New'Heaton Station

‘New’ Heaton Station

Notorious murder

Moving into the twentieth century, an incident took place which brought Heaton Station to the attention of the whole country. On 18 March 1910, John Innes Nisbet, a colliery employee who lived in Heaton, boarded the 10.27am train at Central Station to deliver wages to Widdrington Colliery. When the train arrived at Morpeth, Nisbet’s dead body was found. He had five bullet wounds to the head.

A key witness was Nisbet’s wife, who had gone to Heaton Station to talk to her husband while the train was stopped there. She claimed that she saw the man later identified as John Dickman, the alleged murdererer, sitting in the same carriage as her husband. Dickman, who had also previously lived in Heaton, was found guilty on what many people believed to be unsubstantiated circumstantial evidence. He was hanged but long afterwards the case was cited by opponents of the death penalty.

Suffragettes

On 17 October 1913, suffragettes were reported to have attempted to burn down Heaton Station. According to contemporary press coverage, one of the porters had smelled burning: he saw smoke coming from the direction of the ladies’ waiting room and upon investigation found a large cardboard box behind one of the lavatory doors. It contained open tins of oil, fire-lighters soaked in oil and a piece of candle. It had been positioned in such away that, once alight, it would ignite the contents of the box and then the door. Had it not been discovered, the station may well have been destroyed as it was constructed almost entirely of wood. A few weeks previously Kenton Station had been burned to the ground and earlier that year, a bowls pavilion in Heaton Park destroyed. All three incidents were thought to have been perpetrated by suffragettes, who at this time were accelerating their campaign for womens’ right to vote. 

More information about Heaton Station

That takes us to 100 years ago. Heaton Station finally closed on 11 August 1980 in preparation for the extension of the Metro system. The following photographs are reporduced by kind permission of Alan Young, railway photographer and author, who was brought up on Meldon Terrace. They date from 1972.

Heaton stationHeaton StationHeaton Station, 1972 <

Further information and more images can be found at the Disused Stations website.

Can you help?
If you have information, memories or photographs of Heaton Station or Heaton’s railways, please get in touch.